
Work Verification



Marker Ball Design


Permit Verification



Post Estimate Engineering Support


As-Built Management



Burlingame Hotel



BELLA TERRA MALL, DJM CAPITAL



The Shoppes at Chino Hills



OUTLETS AT ORANGE, SIMONS PROPERTY



ORCHARDS SUPPLY HARDWARE ROLL-OUTS



FRIENDLY HILLS MARKETPLACE, OPPIDAN



THE SHOPPES AT MISSION VIEJO, SIMONS PROPERTY



PLANET FITNESS CENTER ROLL-OUTS



SANTA ANITA MALL, WESTFIELD



Fashion Outlets of Las Vegas, Simon Property



WALMART SUPERCENTER ROLL-OUTS



FOOTHILL TOWNE CENTER



ONTARIO MILLS, SIMONS PROPERTY



CODDINGTOWN MALL, SIMON PROPERTY



SAM’S CLUB ROLL-OUTS



Extended Stay America Roll-Outs



ALBERTSONS, SAV-ON PHARMACY, AND GEMCO ROLL-OUTS



Lowes Home Improvement



Fresh & Easy Roll-Outs



WOODSPRING SUITES



AMERICA’S TIRE & DISCOUNT TIRES ROLL-OUTS
-
Work Verification
The Work Verification Initiative was designed to increase oversight and compliance in the maintenance and repair of PG&E’s transmission line assets. The program has significantly reduced cycle time and increased efficiency. To date, N Consulting has contributed to reducing the average cycle time by over 75%. Combining active project management, data management, quality control and assurance, and robust enterprise software, the Work Verification Program is a continually improving program blending NCE’s strong software and engineering skillsets. -
Marker Ball Design
The Marker Ball Project is a modernization effort led by N Consulting on PG&E’s Transmission Lines. NCE was tasked with updating standards and materials to meet new FAA and NESC requirements. Additionally, the Marker Ball Project involved the design and PLS-CADD model update of marker balls on over 30 Transmission lines. The project combined expertise in advanced PLS-CADD modeling, budget management, materials sourcing, electrical engineering, and project management. -
Permit Verification
The Permit Verification Program completely overhauled PG&E’s permitting process with Caltrans, UPRR, and other agencies. Utilizing our extensive entitlement and civil engineering expertise, N Consulting was able to achieve a 99.5% first submittal permit approval while reducing the permit timeline by over 80%. Through the creation of a detailed tracking database, the preparation of permit exhibits, and the screening of all permits, N Consulting Engineers has been able to significantly reduce the permitting timeline and virtually eliminate permit rejections. -
Post Estimate Engineering Support
N Consulting Engineers initiated their Post Estimate Engineering Support program in 2018 with Pacific Gas & Electric (PG&E). In order to expedite maintenance project closure and minimize documentation, NCE instituted a system of documenting all expenses and related charges, as well as assembled the construction packages in advance of maintenance work. Utilizing our extensive engineering background, NCE prepares and assembles the necessary engineering, legal, and financial documentation required for project closure, improving both compliance and efficiency for the transmission division. -
As-Built Management
Implemented in 2017, N Consulting Engineers oversees the As-Built Management program for Pacific Gas & Electric (PG&E). The extensive program encompasses employee training, active oversight and reporting, permit prioritization, and GIS mapping. With continuous feedback and coordination built inherently in the program, NCE has been able to increase the number of orders processed per month by over 500% throughout the lifetime of the contract. -
Burlingame Hotel
- Burlingame, CA
- 404- Key Hotel
- Site Development & Layout
- Entitlement Processing
- Construction Documents
-
BELLA TERRA MALL, DJM CAPITAL
- Huntington Beach, CA
- Regional Mall
- Open Air Shopping Mall
- Entitlements
- Survey
- Complete Engineering Services
- Construction Documents
-
The Shoppes at Chino Hills
- Chino Hills, CA
- 375,000 SF
- Open Air Shopping Mall
- Restaurants
- Mixed-Use Office
-
OUTLETS AT ORANGE, SIMONS PROPERTY
- Orange, California
- Major urban regional mall and entertainment destination
- Mall security and safety component included in site design
- Lighting and improvements for energy efficiency and to improve mall safety
- Survey
- Complete Engineering Services
- Innovative water quality design, including the State’s first rainwater harvesting and re-use system in a retail commercial development
-
ORCHARDS SUPPLY HARDWARE ROLL-OUTS
Over 10 Locations
-
FRIENDLY HILLS MARKETPLACE, OPPIDAN
Whittier, CA
7.6 – Acres Ground-up Retail Development
-
THE SHOPPES AT MISSION VIEJO, SIMONS PROPERTY
- Mission Viejo, CA
- Major Expansion and Renovation
- Addition of Two Parking Structures
- Roof Mounted Solar Panels
-
PLANET FITNESS CENTER ROLL-OUTS
Over 40 Locations
-
SANTA ANITA MALL, WESTFIELD
- Arcadia, California
- 1,000,000 SF
- Regional Mall
- Construction Documents
-
Fashion Outlets of Las Vegas, Simon Property
- Las Vegas, NV
- 100-Acre Development
- 371,000 SF
- Enhanced Design Standard Compliance
- Regional Deser Alluvium Fan Flood Plain Reclamation
-
WALMART SUPERCENTER ROLL-OUTS
- Foothill Ranch, CA
- 177,000 SF
- Town Center Anchor
- EIR Entitlement
- Commercial Association Compliance
- Over 50 Locations
-
FOOTHILL TOWNE CENTER
- Foothill Ranch, CA
- Retail
- Town Center Anchor Store
- Entitlement
- Construction Documents
-
ONTARIO MILLS, SIMONS PROPERTY
Over 10 Locations
-
CODDINGTOWN MALL, SIMON PROPERTY
- Santa Rosa, CA
- Design and Construction Engineering for Utility Extensions
- On-site Design and Construction Engineering for BJ’s Restaurant & Brewery
-
SAM’S CLUB ROLL-OUTS
Over 30 Locations
-
Extended Stay America Roll-Outs
Over 10 Locations.
-
ALBERTSONS, SAV-ON PHARMACY, AND GEMCO ROLL-OUTS
Over 100 Locations
-
Lowes Home Improvement
- Aliso Viejo, CA
- Big Box Retail
- Town Center Anchor Store
- Enhanced Design Standard Compliance
- Award Winning Service
- Over 60 Locations
-
Fresh & Easy Roll-Outs
Over 40 Locations
-
WOODSPRING SUITES
Over 10 Locations
-
AMERICA’S TIRE & DISCOUNT TIRES ROLL-OUTS
Over 35 Locations